Field | Type | Description |
---|---|---|
runnr | int | The runnumber |
date | date | Date at which run was created |
starttime | time | Starttime of the run, accurate to 1 sec ( from march 2007 onwards, before to 1 min ) |
period | int | The ESA - ILC run period, where 0 : April 2006 run, 1 : July 2006 run, 2 : March 2007 run, 3 : July 2007 run |
subprocs | varchar(80) | List of active subprocesses in DAQ for this run |
pedrun | int | Pedestal runnumber for this run |
type | int | Run type, where 0 : stability run, 1 : xcor28 calibration, 2 : ycor29 calibration, 3 : xcor32 calibration, 4 : ycor33 calibration, 5 : energy setpoint scan, 6 : x setpoint scan, 7 : y setpoint scan, 8 : bpmcali, 9 : mover scan, 10 : helmholz calibration, 11 : Q38 bowtie scan, 12 : systematic study, 13 : Wakefield box scan, 14 : Hardware checkout run, 15 : Alignment run, 16 : Other |
status | unsigned int | Processing status bitword for this run |
experiment | int | Experiment that took the run, where 0 : T474, 1 : T475, 2 : T480, 3 : Zen, 4 : T488, 5 : Other |
magcurr | float | Chicane magnet current during most part of the run |
wigcurr | float | Wiggler magnet current during most part of the run |
optics | int | Optics configuration used during this run, where 0 : T474 optics, 1 : T480 optics, 2 : T487 optics |
dqword | unsigned int | Data quality bitword, explanation of bits :
|
crew | varchar(80) | The shift crew |
daqcomment | text | Comments entered in the DAQ window at the start of the run |
usercomment | text | Comments from the eLog with the run and given by the users during analysis of the data |