T-474 phone conference |
Monday 04 september 2006, 09:00 SLAC time, 17:00 UK timePhone number : +1 510-665-5437Meeting code : 0419 |
hardware points |
|
analysis points |
|
minutes |
Minutes of the T474 phoneconference Monday 4th of September 2006 *********************************** - Alex reported on his new proposal for the scheme of the calibration electronics. Schemes can be found linked above. Some notes with his explanation : o the amplifiers + the switch give 80dB isolation from the source when turned off o the power level from the calibration tone in the end station would be about 4 dBm, not takin into account other sources of losses o a powermeter, which would cost 1500 would probably be too expensive, so it probably makes sense to replace it with just some diodes and plug the output into an ADC - Yury suggested it would probably be better to look at high gain crystals for measuring the power. He also wonders about the gain stability of the amplifiers when they are turned on and off at 10 Hz. --> need to get manufacturer specifications on stability and repeatability of gain of these amps - Stewart brought up the issue of gain loss in the cables. Yury suggests we could monitor a cable in itself by leaving it unterminated or even better just shorted. - We need to put in a proposal for the cable plant to Mike. Roughly it would be o 1 long cable (~40 m) for the calibration tone, which runs from the counting house. We think of using 1/2 " heliax for this o 3 cables for the new BPM (x,y, and Q) for this we probably can use 1/4 " heliax. o if we are moving BPM4, it probably makes sense to have 2 new cables at it's new location. Yury mentioned that SLAC doesn't allow heliax cables anymore because of fire hazard. They would have to be replaced by so-called LMR cables from Times Microwave (www.timesmicrowave.com) - Bino will have a look into implementing the VSAM data and the second filter into Yury's code. It was decided to create a tree next to the position and tilt tree (ntp2) which impements a double filter DDC, however this will probably require a parallel set of DDC constants etc. Will look into this. - Filimon's July 06 "good runs" list is linked from the UCL T474 website now as Stewart suggested. THe list is at https://www.hep.ucl.ac.uk/elog/T-474/47 - Stewart mentioned the software package "SystemVue" which can be used for extensive electronics simulations. The website can be found at http://www.eagleware.com/products/systemview/index.html - Yury mentioned that Mahsa is doing the geophone vibration measurements in the end station. She will report on the T474 eLog. He also mentioned that the person that was responsible for getting the movers for Chris' BPMs is Gordon Bowden, [email protected]. Need to contact him about the actuall type of movers used for Chris' BPMs. - The next meeting will be on Monday, September 18th at 17:30 UK time, 9:30 US time. |